ORGANISATION · BR · NACE 35.11 Production of electricity (hydro)
Foz do Chapecó Energia S.A.
www.fozdochapeco.com.br · 1 documented exposure in the atlas.
Brazil's power grid under El Niño: southern inflow at four times its mean over 1 to 11 November 2026, turbinable water spilled in daylight hours
Exposed · Operational, local · deduced · Supply shock, 2026-11-06
“Dados sobre os níveis do reservatório e as vazões de água envolvidas na operação da Usina, que permitem acompanhar o comportamento do rio Uruguai e as ocorrências climáticas que influenciam suas condições e de seus afluentes.” — source, 2026-11-13
The company's page places its plant on the Uruguai and publishes turbined and spilled flows. In the ONS open-data file of turbinable spilled energy for 1–11 November 2026 (sum by agent, hourly values averaged), the agent Foz do Chapecó shows 53 MW average. The quote shows the location only; no statement of the company on the November spill was read.
Series concerned: south-turbinable-spill-mwmed south-total-spill-mwmed south-ena-gross-pct-mlt · read the edition →
Positions are stated per signal with the public evidence that supports them. An organisation can ask for a correction at the address in the footer.