ShockAtlas

ORGANISATION · BR · NACE 35.11 Production of electricity (nuclear)

Eletrobras Termonuclear S.A. (Eletronuclear)

www.eletronuclear.gov.br · 1 documented exposure in the atlas.

Brazil's power grid under El Niño: southern inflow at four times its mean over 1 to 11 November 2026, turbinable water spilled in daylight hours

Competitor · Operational, local · deduced · Supply shock, 2026-11-06

“A segunda usina nuclear brasileira começou a operar comercialmente em 2001. Com potência de 1.350 megawatts, Angra 2 é capaz de atender ao consumo de uma cidade de 2 milhões de habitantes, como Belo Horizonte.” — source, 2026-11-13

The operator's page gives the 1,350 MW of Angra 2. In the ONS thermal dispatch file for 1–11 November 2026 Angra II generated 1,355 MW average, declared inflexible, the largest must-run block of the Southeast while that subsystem spilled 4,421 MW of turbinable energy. That a nuclear unit cannot follow load is general knowledge, not a statement read; no link to the event is made by the operator.

Series concerned: southeast-turbinable-spill-mwmed southeast-cmo-halfhourly-daily-mean-brl-mwh · read the edition →

Positions are stated per signal with the public evidence that supports them. An organisation can ask for a correction at the address in the footer.

Premium, 49 USD / month: every published analysis as files, with a key for the API and the MCP server.What Premium includes →