ORGANISATION · BR · NACE 35.11 Production of electricity (coal, gas); 35.13 Distribution of electricity
Âmbar Energia S.A. (J&F group)
ambarenergia.com.br · 1 documented exposure in the atlas.
Brazil's power grid under El Niño: southern inflow at four times its mean over 1 to 11 November 2026, turbinable water spilled in daylight hours
Competitor · Operational, local · evidenced · Supply shock, 2026-11-06
“A participação de Candiota III no Leilão de Reserva de Capacidade (LRCAP) de 2026 é “economicamente inviável”, pelos parâmetros de flexibilidade exigidos pelo Ministério de Minas e Energia (MME), informou a Âmbar Energia. A empresa do grupo J&F opera a usina desde 2024, após comprá-la da Eletrobras.” — source, 2026-11-13
The article of August 2025 shows Âmbar as operator of the Candiota III coal plant in Rio Grande do Sul and the plant as unable to meet flexibility requirements. In the ONS thermal dispatch file for 1–11 November 2026 Candiota III generated 325 MW average, nearly all declared inflexibility, in the subsystem that spills. The article describes the plant as without a contract at that date; a later contract is reported by search results that were not opened.
Series concerned: south-turbinable-spill-mwmed south-cmo-halfhourly-daily-mean-brl-mwh south-net-exchange-mwmed · read the edition →
Positions are stated per signal with the public evidence that supports them. An organisation can ask for a correction at the address in the footer.